Sell an Unfinished or Half-Built House in Spring Hill & Hernando County for Cash
Stalled block shell on a Spring Hill quarter-acre? Expired Hernando County permit, an overgrown lot, a builder who disappeared? Libera Capital Group buys unfinished homes exactly as they stand, and we handle the permit, lien and completion problems after closing.
- Shells, slabs & dried-in homes
- Expired or inactive permits OK
- No commissions or repairs
- Close on your timeline
Get Your Cash Offer
No obligation. No fees. No repairs. Tell us about the property and we'll follow up with a cash offer.
Spring Hill was built on the idea of the single lot. Starting in the late 1960s, a developer carved thousands of quarter-acre homesites out of the sandhills and pine flatwoods west of US 19 and sold them, many to buyers who lived far away. Decades later, those scattered lots are still filling in one house at a time, and that is exactly how a half-finished house happens here: an owner or small spec builder pours a slab on one lot, goes up in block, and then something breaks. The money runs short, the contractor gets in trouble with the state, a hurricane season scrambles the schedule, or a soil report raises a sinkhole question nobody budgeted for.
When that happens, the clock keeps ticking. Hernando County expects inspections to keep moving, Code Enforcement expects the lot to be mowed and secured, the lender expects payments, and every subcontractor who wasn’t paid has a short window to record a lien. If you are the person holding that half-built house, you probably don’t want to become a general contractor overnight. You want a way out that is fair and fast.
That is what this page is for. We explain how unfinished construction actually works in Spring Hill, Brooksville, Weeki Wachee, Hernando Beach, Ridge Manor and the rest of the county, what the county’s permit rules mean for a stalled job, which costs pile up while you wait, and how a direct sale to Libera Capital Group works. For the broader picture beyond Hernando, see our statewide guide to selling unfinished and half-built homes in Florida; for everything else about selling in this county, see our Hernando County cash home buying page.
Why Hernando County Owners Sell Stalled Construction to Libera Capital Group
We buy the house at whatever stage it stopped
Footers and a slab, a block shell with no trusses, a dried-in house with no drywall, or a home that only needs a final electrical and a CO. We look at the stage, not just the address, and price the remaining work line by line.
The permit problem comes with the house
You don’t have to reactivate a Hernando County permit, hire a new contractor of record or pay for an engineer’s letter before selling. We take on the re-permitting, inspections and close-out ourselves after closing.
Liens get handled at the closing table
Construction liens, code fines, mowing assessments, a construction loan in default or a recorded lis pendens are paid, negotiated or released through a Florida title company, so you walk away with a clean break.
A Southwest Florida team that travels north
We are based in Fort Myers, where scattered-lot spec homes are just as common, and we buy across all 67 counties. Our team also speaks Spanish, Haitian Creole, French, German and Portuguese.
Why So Many Half-Built Homes Sit in Spring Hill and Hernando County
Most of Florida’s stalled construction is not in big subdivisions run by national builders; those builders finish what they start. It is in pre-platted, lot-by-lot communities, and Spring Hill is one of the largest in the state. Because the lots were sold off individually decades ago, a single street can have a 1978 ranch, a 2005 boom-era home, an empty wooded lot and a brand-new slab with rebar sticking out of the block cells. Each of those new homes is its own small project with its own permit, its own builder and its own budget.
The typical stalled projects we see here
- Owner-builder homes. Someone bought a lot cheaply, pulled an owner-builder permit and planned to manage subs themselves. Life got in the way: a job transfer, a divorce, a health problem, or simply costs that ran far past the spreadsheet.
- Small spec builders. A builder with a handful of Spring Hill lots starts several homes at once on short-term money. When sales slow or a draw is delayed, the last house started is the first one parked.
- Build-on-your-lot contracts. A family hires a builder to put a house on the lot they already own, pays deposits and draws, and then the builder stops showing up, files bankruptcy or loses its license.
- Inherited projects. A parent was building a retirement home in Spring Hill or near Brooksville and passed away mid-construction, leaving heirs with an open permit, a construction loan and a house they never planned to own.
- Rural owner projects. East of Brooksville toward Ridge Manor, Nobleton and Istachatta, and north toward Brookridge, larger parcels with wells and septic sometimes hold a barndominium, a block home or an addition that was started and never inspected past the slab.
Why a stall here gets expensive quickly
A paused project in Spring Hill is exposed to a long rainy season, intense summer heat and fast vegetation growth. Exposed block absorbs water, rebar in open cells rusts, unprotected trusses and sheathing weather, and an open foundation can collect water against a slab. On top of the physical decay, there are carrying costs that don’t stop: property taxes on the improved value, interest on any construction loan, builder’s-risk insurance if you can still get it, and fines or abatement charges if the lot becomes a nuisance. A shell that was a manageable problem in January can look very different by October.
Hernando County Building Permits: Inactive, Expired and Reactivated
Unincorporated Hernando County, which includes Spring Hill, Weeki Wachee, Hernando Beach, Ridge Manor and most of the county, is permitted by the Hernando County Building Division, part of the county’s Development Services operations in Brooksville. If your lot is inside the City of Brooksville, check with the city as well, since municipal limits can change who handles parts of the approval. Either way, the rules are built on the Florida Building Code’s administrative chapter, which ties a permit’s life to steady progress.
What “inactive” and “expired” usually mean here
Under the Florida Building Code framework, a permit becomes invalid if the authorized work isn’t started within a set period after issuance or if work is suspended or abandoned for a set period after it starts, commonly 180 days. In practice, “progress” is measured by passed inspections. Hernando County’s current extension and reactivation request form (revised January 2025) asks the owner-builder or contractor to explain any delay in scheduling an inspection within 180 days of the last completed inspection, and it notes that construction under the permit is expected to be finished within two years of original issuance. The county’s own records will show the permit as active, inactive, expired or similar, and that status is what a buyer’s title company and inspector will look at.
Extensions and reactivation in Hernando County
The county’s form allows a written request for an extension or reactivation. Based on that form, the Building Official may grant an extension of up to 90 days when the request is made in writing before expiration and justifiable cause is shown, a fee applies, and the applicant has to commit to a date for the next inspection. The form is signed by the contractor of record or the owner-builder, which is a key point: if your contractor has walked away, you can’t simply sign on his behalf. Rules, fees and forms can change, so the Building Division is the final word for any specific permit.
What re-permitting can involve
If a permit is beyond saving, the house usually needs a new permit. That can trigger several costs at once:
- A new contractor of record willing to take responsibility for work someone else built, or a qualifying owner-builder under Florida’s owner-builder exemption.
- The current Florida Building Code edition. A home permitted under an older edition may have to meet the edition in force when the new permit is issued, which can affect windows, doors, energy compliance, roof attachment and more.
- Engineer or special-inspector letters for work that was covered or exposed without inspection, such as filled block cells, tie beams, truss strapping or slab reinforcement.
- Revised plans if the original drawings are missing, the design changed in the field, or the original designer won’t release them.
- Destructive investigation in some cases, like opening walls or coring a slab, so an inspector can verify what is inside.
None of that is a reason to panic. It is simply the work that stands between a stalled shell and a certificate of occupancy, and it is work we price and take on ourselves when we buy. If the trouble is less about an expired permit and more about work done without one, our guide to selling a house with code violations or unpermitted work goes deeper.
Hernando County Code Enforcement, Tall Grass and Securing the Site
Code Enforcement in unincorporated Hernando County works out of Development Services alongside the Building Division. An unfinished house tends to draw complaints from neighbors for predictable reasons: grass and weeds that grow waist-high in a single wet summer, construction debris and pallets, an open foundation or unprotected excavation, a dumpster that never left, standing water that breeds mosquitoes, or an open shell where kids or trespassers can get in. One county detail worth knowing: Hernando’s code says officers generally can’t open a case from an anonymous complaint; the person reporting has to give a name and address, unless there’s an imminent threat to health or safety. On a street full of year-round neighbors, that rarely slows things down for long.
How a case grows into a lien
Florida’s local code enforcement law, Chapter 162 of the Florida Statutes, gives counties and cities a standard path: a notice of violation, a deadline to fix it, a hearing before a special magistrate or code board if it isn’t fixed, and then daily fines that can be recorded as a lien against the property. Separately, local nuisance ordinances commonly let a county mow, clear or secure a lot itself and then bill the owner, with unpaid charges becoming a lien or special assessment. Exact procedures, fine amounts and lien priorities vary, so check the Hernando County Lien & Violation Search or ask Development Services about any specific parcel.
Unsafe structures
A half-built house that is open, leaning, storm-damaged or deteriorating can be declared unsafe by the building official. In Hernando County, unsafe-building appeals have gone before the Board of County Commissioners in a quasi-judicial hearing, which tells you how seriously the county treats these notices. An unsafe-structure order can require you to secure, repair or demolish within a deadline, and the county may do the work and charge the cost back to the property if you don’t. If you have received one of these notices, act quickly and get advice from a Florida attorney; a sale can often be structured around an open case, but deadlines still matter.
What we do about the lot
Sellers often ask whether they should mow, haul off debris or board openings before calling us. You can if it is easy and it prevents new fines, but you don’t need to clean anything up to sell. When we buy a stalled Hernando County house, mowing, debris removal, temporary fencing, pool or excavation barriers and boarding become our job after closing. Existing fines and liens are dealt with through title, which we explain below.
Septic, Sewer, Wells and Sinkhole Questions in Spring Hill
Water and sewer service
Much of Spring Hill gets water from the Hernando County Utilities Department, but a large share of homes rely on private septic systems rather than central sewer, and many rural parcels east and north of Brooksville use private wells. For a half-built house, that means the underground part of the project may be just as unfinished as the walls. A septic system that was permitted but never installed, a drain field that was laid out before the house plan changed, a well that was drilled but never permitted for potable use, or an unpaid connection or impact fee can all hold up a certificate of occupancy. Since July 2021, Florida’s onsite sewage (septic) program has been administered by the Florida Department of Environmental Protection rather than the Department of Health, so older paperwork may carry a different agency’s name.
Septic-to-sewer near Weeki Wachee
Hernando County has also been working on a septic-to-sewer program in the area closest to Weeki Wachee Springs, driven by Florida’s 2016 Springs and Aquifer Protection Act and the state’s restoration plan for the spring. If your unfinished house sits in or near a targeted district, sewer availability, connection requirements and timing can affect what kind of system a completed home will need. We check service availability for the specific parcel as part of our pricing, so you don’t have to research it yourself.
Sinkholes and soil testing
Hernando sits in the stretch of west-central Florida often called “sinkhole alley,” along with Pasco and Hillsborough. On an unfinished house, a sinkhole question can surface in several ways: a geotechnical report done during permitting found a soft zone, a slab cracked while the house sat exposed, a neighbor’s home had a claim, or a depression formed on the lot during a wet season. That can stop a project cold, because a lender or a new builder may require ground-penetrating radar, additional borings, an engineer’s report and possibly compaction grouting or underpinning before going further. Insurance is another hurdle: Florida insurers must cover catastrophic ground cover collapse on a covered home, but broader sinkhole coverage is generally optional, and a half-built house usually isn’t covered by a standard homeowners policy in the first place. For more on finished homes with sinkhole history, our Hernando County page covers that separately; here, the point is that we will make an offer on a stalled build even when the ground question is still open, and we price that uncertainty openly.
Storms, Surge and Flood Rules on the Hernando Coast
Recent hurricane seasons hit Hernando County hard. Hurricane Idalia in August 2023 pushed surge into Hernando Beach and the coastal neighborhoods west of US 19. Hurricane Helene in late September 2024 brought surge that local officials described as unprecedented to Hernando Beach, Aripeka and the Weeki Wachee River area, and Hurricane Milton followed less than two weeks later with wind and heavy rain across the county. An unfinished house went through those storms without the protection a finished home has: no shutters, open window bucks, partial roofs, unbraced walls.
Why the coast is different
Half-built homes on the canals of Hernando Beach or along the Gulf side of Weeki Wachee face rules that inland Spring Hill lots usually don’t. Many of these parcels are in FEMA special flood hazard areas, where new construction has to meet elevation requirements, and some coastal zones require pilings or other elevated foundations. A project that started before a flood map update, or before storm damage, may need a current elevation certificate and possibly a redesign. If an existing structure was damaged, the 50% substantial-damage rule can require the whole building to be brought into compliance with current flood rules. Those are major cost drivers that a typical buyer can’t evaluate, which is why coastal shells often sit. Our page on selling hurricane- and flood-damaged property explains the damage side in more depth.
Insurance gaps after a storm
Standard homeowners insurance generally isn’t written on a house until it is finished and has a certificate of occupancy. During construction, coverage usually comes through a builder’s-risk policy, which may have lapsed if the builder disappeared or the project went quiet. If a storm damaged your stalled house while it was uninsured or underinsured, you are not alone, and it doesn’t stop a sale; we account for storm damage in the same written cost-to-complete estimate.
When the Builder Fails, Loses a License or Runs Out of Money
A large share of the stalled houses we see trace back to the contractor rather than the owner. Typical stories: a builder took a deposit and two draws and then stopped returning calls; a contractor’s license was suspended or revoked by the Florida Construction Industry Licensing Board; a builder filed bankruptcy with several homes in progress; or a general contractor simply ran out of cash because material costs rose faster than its fixed-price contracts.
What you can check yourself
- License status. Look up the contractor on the state’s licensing portal at MyFloridaLicense.com, which shows whether a license is current, delinquent, suspended or revoked and whether discipline is on file.
- Permit status. The Hernando County permit records show the contractor of record, the inspections passed and the current status.
- Recorded documents. The Clerk of the Circuit Court’s official records will show your Notice of Commencement, any Claims of Lien, and any lis pendens.
The Homeowners’ Construction Recovery Fund
Florida maintains a Homeowners’ Construction Recovery Fund, created under Sections 489.140 through 489.144 of the Florida Statutes, that can compensate some homeowners harmed by certain misconduct of licensed contractors, such as abandoning a job or mismanaging funds. Eligibility rules, deadlines, caps and required steps apply, and the fund is administered through the Department of Business and Professional Regulation. Whether you qualify is a question for DBPR and a Florida attorney, but it is worth knowing about, and selling the house doesn’t necessarily end your claims against a contractor. Talk to counsel about how to preserve them before you close.
Owner-builders who want out
If you pulled the permit yourself as an owner-builder, Florida law (Section 489.103(7)) generally requires that you be building for your own use and occupancy, and selling the home within one year after completion can create a presumption that it was built for sale. Selling an unfinished house is a different situation, but the owner-builder disclosures you signed still matter, and a new owner usually can’t continue under your owner-builder permit. That is one more reason a stalled owner-builder house is easier to sell to a buyer who expects to re-permit.
Construction Liens, Lis Pendens and Clearing Title
Unfinished houses tend to collect paperwork at the Hernando County Clerk’s office. Here is what typically shows up and how it is cleared when you sell.
Notice of Commencement and construction liens
A Notice of Commencement under Section 713.13 is recorded before most construction starts, and unless it states otherwise it generally expires one year after recording. Subcontractors and suppliers who aren’t paid usually serve a Notice to Owner and can record a Claim of Lien under Chapter 713, and a lienor generally has a limited time, often one year from recording, to file suit to foreclose the lien. Some liens are valid, some are inflated, and some have expired on their own. A title company and, where needed, a Florida attorney sort out which are which.
Lis pendens
A lis pendens under Section 48.23 is a recorded notice that a lawsuit involving the property is pending: a lender’s foreclosure on the construction loan, a contractor’s lien foreclosure, or a dispute among owners or heirs. It doesn’t stop a sale by itself, but it clouds title until the case is resolved, settled or the notice is released or discharged. In practice, a cash sale often resolves the case by paying the claimant from the proceeds, negotiating a reduced payoff, or closing with the plaintiff’s written release. Our pages on selling during foreclosure and selling with back taxes and liens cover those paths in more detail.
Code liens and mowing assessments
Recorded code-enforcement liens and abatement charges are searched along with everything else. Local governments sometimes agree to reduce accumulated fines once a property changes hands and a buyer commits to bringing it into compliance; whether Hernando County will do that for a particular case is up to the county. We ask, but we don’t promise a reduction.
How We Value an Unfinished House in Spring Hill
Every offer we make on stalled construction starts from the same simple equation, and we show it to you in writing:
- Value when finished. What a comparable completed home on a similar Spring Hill or Hernando County lot sells for today.
- Cost to complete. Permits and re-permitting, engineering and special-inspector letters, revised plans, materials, labor, septic or sewer work, utility connections and impact fees not yet paid, inspections and final close-out.
- Correction costs. Anything that has to be torn out or redone because of weather exposure, rust, mold, storm damage, failed inspections or code changes.
- Carrying costs. Taxes, builder’s-risk insurance, interest, utilities and site maintenance during the months it takes to finish and sell.
- Payoffs. Construction loan, liens, code fines and assessments that have to be satisfied at closing.
- Risk. Unknowns such as soil conditions, hidden defects or a permit history the county may not accept as-is.
We don’t apply a fixed percentage and we don’t promise a number before we’ve seen the property and the records. What we do promise is transparency: if our cost-to-complete figure looks high to you, we’ll walk through it line by line, and you’re welcome to get your own contractor’s estimate to compare.
Finish It, Hire a New Builder, List It or Sell to Us: Hernando County Options Compared
There’s no single right answer for every stalled Spring Hill house. If you have time, cash reserves and the appetite to manage a job site, finishing can produce the highest gross price. If you don’t, the other paths are worth comparing honestly.
| Factor | Finish it yourself | Hire a new GC to finish | List it unfinished | Sell to Libera Capital Group |
|---|---|---|---|---|
| Permit work | You reactivate or re-permit, possibly as owner-builder | New contractor of record re-permits; may require engineer letters | Buyer’s problem, which shrinks the buyer pool | We handle it after closing |
| Cash you need now | All completion costs plus carrying costs | Deposit and draws; many GCs price takeovers at a premium | Carrying costs while it markets | None; we pay normal closing costs |
| Financing | Hard to get a new construction loan on a stalled job | Depends on your credit and the lender | Most buyers’ lenders won’t finance an unfinished home | All cash, no lender approval needed |
| Liens, fines and lis pendens | You resolve them first | You resolve them first; GCs avoid lien-clouded jobs | Must be resolved before or at closing | Resolved through title at our closing |
| Timeline | Often many months, plus sale time | Often many months, plus sale time | Uncertain; cash buyers only | Often about two weeks once title is clear |
| Commissions | Typically when you later list the finished home | Typically when you later list the finished home | Often 5 to 6 percent plus concessions | None |
| Risk | Cost overruns, inspection failures, storms | Contractor risk again, overruns | Price cuts, deals falling apart | Shifts to us at a price agreed up front |
For a deeper side-by-side on finished homes, see cash offer vs. listing with an agent. If a straight cash price doesn’t fit your numbers, ask about creative financing options such as seller financing on part of the price.
How Selling an Unfinished Hernando County House Works
- Tell us about the project. Use the form or call (239) 686-0823 with the address, the stage of construction, the permit number if you have it, and anything you know about liens, loans or code cases. Plans, engineering, the builder contract and draw history help but aren’t required.
- We research and walk the site. We pull the Hernando County permit and inspection history, check the Clerk’s records for liens and lawsuits, confirm utility and septic status, and walk the house with you or your representative.
- You get a written offer with the math. We show the finished value, our cost-to-complete estimate, the payoffs we found and the resulting cash price. Questions are welcome.
- Close with a Florida title company. The title company handles payoffs, releases and recording. You choose the closing date, and you leave the debris, the permit and the grass behind.
More detail on each step is on our how it works page.
Related Situations and Property Types We Buy
- Unfinished & half-built homes in Florida
- Code violations & unpermitted work
- Major repairs & fire damage
- Hurricane & flood damage
- Inherited & probate property
- Vacant property
- Foreclosure
- Back taxes & liens
- Lenders holding defaulted construction loans
- Single-family homes
- Duplexes & multifamily
- Unfinished commercial shells
- Selling any house in Spring Hill
Nearby Unfinished-Construction Markets and Counties
- Unfinished homes in Citrus Springs
- Unfinished homes in Ocala & Marion Oaks
- Unfinished homes in Deltona
- Hernando County
- Citrus County
- Pasco County
- Sumter County
- Hillsborough County
Key takeaways
- Spring Hill’s lot-by-lot layout means stalled homes are usually one-off owner-builder or small-builder projects, not subdivision phases.
- Hernando County ties a permit’s life to passed inspections; its extension and reactivation form references a 180-day inspection window, extensions of up to 90 days for justifiable cause, and a two-year completion expectation.
- Septic, sewer availability, well permitting and sinkhole testing can stall a house as much as the walls can.
- Coastal shells in Hernando Beach and Weeki Wachee carry flood-zone and post-Helene questions that inland lots usually don’t.
- Liens, code fines and a lis pendens are cleared through title at closing; you don’t need to resolve them first.
- We show our cost-to-complete math in writing and never promise a percentage before seeing the property.
Frequently Asked Questions about Selling an Unfinished House in Spring Hill & Hernando County
Will you buy a half-built block home in Spring Hill that’s just a shell?
Yes, we buy Spring Hill shells at any stage, from a slab with rebar to block walls with no roof to a dried-in house waiting on interior work. We price the remaining construction ourselves, including re-permitting, engineering and weather damage to exposed materials. You don’t need to finish, clean or protect the shell before selling, and you don’t need a contractor to vouch for the work done so far.
My Hernando County building permit expired. Can I still sell?
Yes, an expired Hernando County permit doesn’t prevent a sale; it changes who deals with it. After we buy, we either work with the Building Division on reactivation if that’s still possible or apply for a new permit and do whatever inspections, engineer letters or plan revisions the county requires. You don’t need to reactivate the permit or pay re-permitting fees before closing.
How long can a Hernando County permit go without an inspection?
Hernando County’s extension and reactivation form refers to scheduling an inspection within 180 days of the last completed one, which follows the Florida Building Code’s general approach. The same form describes extensions of up to 90 days for justifiable cause and a two-year completion expectation from issuance. Policies and fees can change, so confirm the status of any specific permit directly with the Hernando County Building Division.
Hernando County Code Enforcement cited my unfinished lot for tall grass. What now?
You can still sell, and any resulting fines or abatement charges are handled through title at closing. If it’s practical, mowing before the deadline can stop new fines from accruing, but it isn’t required to get an offer from us. Once we close, keeping the lot mowed, cleared and secured is our responsibility, and we deal with Code Enforcement directly on any open case.
Do you buy unfinished houses that have a sinkhole report or soil problem?
Yes, we make offers on stalled Hernando County builds even when a geotechnical report flagged a soft zone or a sinkhole question is unresolved. We factor in testing, engineering and possible stabilization as part of the cost to complete. Please share any reports you have; disclosure helps us price fairly. A Florida attorney can tell you what you’re legally required to disclose in your situation.
My half-built house near Weeki Wachee needs a septic system that was never installed. Is that a problem?
No, a missing or unfinished septic system is simply part of our cost-to-complete estimate. We check whether central sewer is available or planned for that parcel, including the county’s septic-to-sewer work near Weeki Wachee Springs, and what a permitted septic system would require if not. You don’t have to pull a septic permit or hire an installer before selling.
Can I sell an unfinished Hernando Beach home damaged by Helene or Idalia?
Yes, we buy storm-damaged coastal shells in Hernando Beach, Aripeka and along the Weeki Wachee. We account for surge damage, flood-zone elevation rules, a new elevation certificate and possible redesign in our estimate. If the structure suffered substantial damage, current flood requirements may apply to the whole building; that’s a cost we take on, not a reason you can’t sell.
My builder’s license was suspended and he stopped work. Can I still sell the house?
Yes, a contractor’s suspended or revoked license doesn’t prevent you from selling the property. You can verify the license status on MyFloridaLicense.com, and you may have claims against the contractor or possibly through the state’s Homeowners’ Construction Recovery Fund. Talk to a Florida attorney about preserving those claims before closing; selling the house doesn’t automatically end them.
Subcontractors filed liens on my unfinished house. Do I have to pay them before selling?
No, construction liens are typically paid, negotiated or released at closing through the title company rather than beforehand. Some liens may be invalid or expired, and a Florida attorney or the title company can evaluate them. Valid liens are paid from the sale proceeds, so you don’t need cash in hand to clear them before signing a contract with us.
There’s a lis pendens on my Spring Hill property. Can it still close?
Usually yes, a lis pendens can be resolved as part of a cash sale. Depending on the lawsuit, the plaintiff is paid from proceeds, agrees to a negotiated payoff, or signs a release so the notice is discharged. The title company coordinates it, and your attorney represents you in the lawsuit. We are used to closing with a pending foreclosure or lien case in the background.
I was an owner-builder in Hernando County and can’t finish. What are my options?
Your main options are finishing with hired help, bringing in a licensed contractor to take over, or selling the house as-is. Florida’s owner-builder rules generally don’t let a new owner continue under your permit, so a buyer will expect to re-permit. Selling to us lets you skip that step; we handle the new permit and inspections after closing.
We inherited a half-built house in Hernando County. Can heirs sell it before probate ends?
Heirs can usually sell once someone has legal authority to sign, which often means a personal representative appointed by the probate court. We can sign a contract early and close when that authority is in place. An inherited construction loan, open permit or lien doesn’t stop the process. A Florida probate attorney can advise on the right path, and our inherited property page explains more.
Do you buy permit-ready lots in Spring Hill with approved plans but no construction?
Yes, if the lot has approved plans or an issued permit, we may buy it as a construction project here. Plain vacant lots with no plans or permits go to our land division, SWFLLand.com, instead. Tell us what’s been approved, what’s been paid in fees and impact fees, and whether any site work has started, and we’ll route you to the right team.
Are you licensed, and do you represent me in the sale?
Our principals are licensed Florida real estate brokers, but Libera Capital Group buys as a principal for its own account and doesn’t represent the seller or any other party in the transaction. We encourage you to have your own attorney review the contract. Libera Capital Group is a DiBe Company based in Fort Myers, buying across Florida.
How fast can you close on an unfinished house in Hernando County?
We can often close in about two weeks once title is clear, and we can wait longer if you need time. Liens, a lis pendens, probate or a lender payoff can add time, because those items have to be resolved or coordinated through title. We’ll tell you up front what we see in the records so you can plan around a realistic date.
Ready to Hand Off Your Stalled Spring Hill Project?
Send us the address and what stage the house reached. We’ll research the Hernando County permit and title records and send you a written cash offer with the cost-to-complete math included.
