Sell an Unfinished or Half-Built House in Cape Coral for Cash
Stuck with a shell on a Cape Coral lot, a permit that has gone inactive, or a builder who stopped answering the phone? Libera Capital Group buys half-built Cape homes as they stand, so you can stop paying to carry a project you never wanted to manage.
- Shells, slabs-plus-block and dried-in homes
- Expired permits and code cases OK
- No need to hire a new builder
- Close on your timeline
Get Your Cash Offer
No obligation. No fees. No repairs. Tell us about the property and we'll follow up with a cash offer.
Cape Coral is one of the few places in the country where thousands of single-family homes are built one lot at a time by dozens of small and mid-size builders. That model works well when lumber, labor and loans flow freely. When any of the three dries up, the city ends up with a scattering of half-finished houses: a block shell on a freshwater canal in the northwest Cape, a trussed-but-not-dried-in house on a dry lot off Burnt Store Road, a spec home stalled at drywall because the builder ran out of money on the last three jobs it started.
If one of those houses is yours, you are probably juggling several problems at once: a permit clock that has already run out or is about to, a code compliance officer asking about debris and standing water, a lender asking when the house will be finished, an insurance gap, and a lot that is no longer mowed by the city because building has started. This page explains how each of those pieces works in Cape Coral specifically, what your realistic options are, and how a direct cash sale to Libera Capital Group fits in. For the statewide picture of construction liens, contractor licensing and permit rules, see our main guide to selling an unfinished or half-built home in Florida; for a general overview of selling in the city, our Cape Coral cash home buyer page covers neighborhoods, canals and seawalls in depth.
Why Cape Coral Owners Sell Their Unfinished Homes to Libera Capital Group
We take the project, not just the house
An unfinished Cape home is really a construction project with a deed attached. We buy the whole thing: the open permit, the plans, the materials on site, the half-poured driveway and the punch list nobody wrote. You do not need to line up a replacement contractor first.
The math is shown, not hidden
We put our cost-to-complete estimate in writing, line by line, next to the value we expect when the house is finished. You can check our numbers with your own builder, appraiser or attorney before you sign anything.
Problems settled at the closing table
Code fines, mowing assessments, unpaid subcontractor liens and a lender’s payoff are handled through a Lee County title company at closing, out of the sale proceeds or through negotiated releases, so you are not writing checks in advance.
Local, multilingual and reachable
Our office is in Fort Myers, a short drive over the Midpoint Bridge. Many Cape lot owners live up north or overseas; our team speaks Spanish, Haitian Creole, French, German and Portuguese and can run the whole sale remotely.
How Cape Coral Construction Projects End Up Half-Built
The Cape’s original developers platted the city in the late 1950s and 1960s into tens of thousands of small residential lots, sold many of them by mail, and left most of them empty for decades. That legacy is why so much Cape construction is “scattered-lot” building: one house goes up between two vacant lots, then another a few streets over. Builders here range from large regional companies to one-truck outfits that build three or four spec homes a year. Owners range from retirees building a dream home on a canal lot they bought years ago to out-of-state investors who bought a lot and a build contract as a package.
The common ways a Cape project stops
- The builder runs out of money. Small builders often fund the next house with draws from the last one. When sales slow, costs jump or a lender tightens, the newest jobs stop first. Local TV and newspapers have reported on Cape Coral builders who stopped showing up, closed their showrooms and later settled with the state over their licenses, leaving buyers with walls and a roof but no interior.
- The builder’s license is suspended or surrendered. Once a contractor cannot legally pull or carry permits, every job under that license is frozen until a new licensed contractor or a qualifying owner-builder takes it over.
- The owner’s own budget breaks. Insurance premiums, a job loss, a divorce or a medical problem can turn a manageable construction loan into a payment you cannot keep making.
- A storm interrupts the job. Hurricane Ian in September 2022 tore through Cape Coral while a large number of homes were mid-construction. Some jobs restarted quickly; others sat with wet block, missing trusses or soaked materials for months, and a few never restarted at all.
- The owner dies or the family inherits a project. Heirs in another state may not even know which builder was involved, what was paid, or whether the permit is still alive.
Stages we see and buy
We regularly look at Cape properties at every phase: a stem wall and slab with no block; a CBS (concrete block and stucco) shell with tie beam poured but no trusses; a trussed and sheathed shell with no roof covering; a dried-in house with windows and a roof but no mechanicals; and the most frustrating stage of all, a house that is 90 percent done but cannot pass final because of a failed inspection, a missing survey, an unpaid impact fee or a contractor who refuses to sign off. Each stage carries different risks for water intrusion, rust on exposed rebar and code exposure, and each changes what it costs to finish. None of them stops us from making an offer.
What Happens to an Expired or Inactive Permit in Cape Coral?
Inside city limits, building permits are issued by the City of Cape Coral’s Building Division, part of the Development Services department at City Hall on Cultural Park Boulevard. Permits are applied for, tracked and inspected through the city’s online citizen self-service permitting portal, which is also where you can look up the status of any permit tied to your address. Before you talk to anyone about selling, pull up that record: it tells you who the contractor of record is, which inspections passed, and whether the permit is shown as active, expired or something in between.
The basic Florida Building Code rule
Cape Coral, like every Florida jurisdiction, enforces the Florida Building Code. The code’s administrative chapter generally says a permit becomes invalid if work does not start within a set period after issuance, or if work is suspended or abandoned for a set period after it starts; 180 days is the familiar benchmark, and passing an inspection is what usually proves work is continuing. Local building officials have some room to grant extensions for good cause, and each department sets its own fees and paperwork. When a Cape house has gone months without a passed inspection, there is a real chance the permit is expired or close to it, even if nobody has sent you a letter.
What “inactive” means in practice
Owners often hear three different words for the same worry. A permit is active while inspections keep happening on schedule. It may be flagged inactive or “pending expiration” when the clock is running out. It is expired once the deadline passes without an extension. An abandoned project is a looser, more practical term: the builder walked away, nothing has happened for a long time, and the site has started to deteriorate. In an abandoned situation the permit is usually expired as well, and the code compliance side of the city may already be involved.
Reviving or replacing the permit
Depending on how long the permit has been dead and what the building official decides, the path forward in Cape Coral may involve some combination of the following. Treat this as a checklist of questions to ask the Building Division, not a promise of how your file will be handled:
- Renewal or reactivation of the existing permit, usually with a fee and sometimes only if the plans still meet the code edition in force.
- Change of contractor, where a new licensed contractor (or a qualifying owner-builder) formally takes over the job and becomes responsible for everything already built, which many contractors will only do after an inspection of their own.
- Re-permitting under a newer edition of the Florida Building Code if the old permit cannot be revived, which can mean revised plans, updated energy calculations or new product approvals for windows and doors.
- Engineer’s letters for work that was covered up or left exposed, such as an engineer certifying the condition of rusting rebar, a tie beam, or trusses that sat unprotected through a rainy season or a storm.
- Updated surveys, including form-board, spot and final surveys, and a fresh elevation certificate if the property is in a flood zone.
Every one of those steps costs money and time before a single new block is laid. That is the core reason many Cape owners decide to sell instead: the buyer inherits the paperwork as well as the building. When we buy, we handle the permit path ourselves after closing, working with our own licensed contractor and the Building Division. Florida’s owner-builder exemption (Section 489.103(7), Florida Statutes) lets an individual owner act as their own contractor on their own home under specific conditions, but it comes with real legal responsibility and restrictions on selling soon after completion; talk to the Building Division and a Florida attorney before assuming it fits your situation.
Code Compliance, Construction-Site Upkeep and the Lot Mowing Program
Cape Coral’s Code Compliance division enforces the city’s property maintenance rules, and an unfinished house tends to attract every kind of complaint at once: tall grass, a stagnant pool hole or footer trench full of rainwater, a toppled portable toilet, a dumpster nobody empties, stacks of block wrapped in faded plastic, an unsecured opening where a door should be. Neighbors in a mostly built-out street are often quick to call. Investor discussions about the Cape have described stalled sites receiving construction-site maintenance violations with fines large enough to matter at closing, and the city does have processes for requesting a reduction once violations are corrected. Whether a reduction is available in your case depends on the facts and the city’s decision.
Why the lot mowing program stops helping you
Many Cape owners are surprised by this one. The city runs a Lot Mowing Program for unimproved property: vacant lots are mowed on a schedule from late winter into the fall, and the owner pays through an annual assessment on the Lee County property tax bill. According to the city’s own program information, once a lot is cleared and building begins, it is removed from the program. That means a stalled construction site is your responsibility to mow, and the city’s 12-inch limit on grass, weeds and underbrush still applies. If you live out of the area and assumed “the city mows it,” you may already have a violation open. You can read the program’s rules on the City of Cape Coral Lot Mowing Program FAQ page.
How code fines turn into liens
Florida’s local code enforcement law (Chapter 162, Florida Statutes) lets a city’s special magistrate or code board order a violation corrected by a deadline and set a daily fine if it is not. A certified copy of the order can be recorded and becomes a lien against the property. When the city has to step in itself, for example by mowing, removing debris or boarding an opening, its cost can also be recorded. On a sale, a title company searches for these liens and they are paid or negotiated at closing. Our guide to selling with code violations and unpermitted work explains the general process; the Cape-specific point is that a half-built house can collect several open cases at once, and every month of inaction adds to the total.
Safety items that get attention fast
- Open pool excavations, empty pool shells and deep footer trenches holding water.
- Exposed rebar stubs at the tops of block walls without caps.
- Unsecured door and window openings that invite trespassers.
- Loose materials, sheathing and roofing that become projectiles in high wind.
- Standing water that breeds mosquitoes during the rainy season.
If you still own the property while you decide, securing these items is worth doing; it reduces both your liability and your code exposure. If you sell to us, these become our job after closing.
Utilities, UEP Assessments, Wells and Septic on a Half-Built Cape Lot
Cape Coral is still extending city water, sewer and irrigation into its northern sections through the Utilities Extension Project, usually called the UEP. Neighborhoods receive the lines in phases; for example, the city’s North 1 project area in the northeast Cape was divided into East and West portions, with the West portion reaching substantial completion and residents being notified to connect while the East portion moved into construction. Lots in a UEP area carry a special assessment for the extension, and owners can typically pay it off or finance it over time on the tax bill.
Why utilities matter more for an unfinished home
- The design may have to change. A house permitted for a private well and septic system in an area that later received city lines may need revised plumbing plans, a septic abandonment, and a city connection before it can pass final.
- Assessment balances survive the sale. Unpaid UEP installments and capacity or connection charges show up in title work and are usually paid at closing or carried by the buyer by agreement.
- Impact and connection fees may already be paid. If you paid utility capacity fees or impact fees when the permit was issued, that is real value we credit in our analysis, provided the city still honors the payment under the current or renewed permit. If the permit has expired, ask the city whether those payments carry forward.
- Well and septic work may be half done. In parts of the northwest and northeast Cape still outside the city lines, a stalled house may have a well drilled but no pump, or a septic permit issued but no drain field installed.
Our main Cape Coral page covers how UEP balances affect ordinary resales; for an unfinished house, the practical takeaway is that utility status is one of the first things we check, because it can swing the cost to finish by a meaningful amount.
Flood Zones, Elevation and Storm Exposure for an Unfinished Cape Home
Much of Cape Coral sits low and close to water: more than 400 miles of canals run through the city, and large parts of the southern and western Cape fall in FEMA special flood hazard areas. For a house that is still under construction, flood rules show up in three practical ways.
Elevation was locked in at the slab
In a mapped flood zone, the lowest floor must be built at or above the required elevation, and the city checks that with elevation surveys during construction and an elevation certificate at the end. If your project stalled after the slab was poured, the slab elevation is already fixed. If the flood maps or local floodplain rules changed while the job sat, or if the permit has to be reissued, the building official will look closely at whether the existing slab still complies. A slab that no longer works for the current requirements is one of the costliest surprises a Cape shell can hold.
There is usually no homeowners policy yet
Standard homeowners insurance is written for a completed, occupied house. During construction, the risk is normally covered, if at all, by a builder’s risk policy bought by the contractor or the owner. When the builder disappears, that policy may lapse with it, and an owner can be left with an uninsured shell through a hurricane season. Ask your agent what coverage, if any, applies right now; many owners discover the answer is none.
Ian, then Helene and Milton
Hurricane Ian made landfall in Lee County on September 28, 2022, and Cape Coral saw widespread wind damage, surge along its southern canals and long power outages. Two years later, Helene’s surge pushed up the Gulf coast in late September 2024 and Milton came ashore near Siesta Key on October 9, 2024, bringing more wind and water to Southwest Florida. Each storm left some Cape projects with water-soaked block, displaced trusses, lost sheathing and ruined stored materials. If your shell sat open through any of those storms, expect the next contractor or inspector to want an engineer’s evaluation before anything is closed in. For finished homes with storm damage, our hurricane and flood damage page covers the FEMA substantial-damage rule and insurance claims.
Construction Liens, Lis Pendens and Builders Who Went Under
A half-built house in Cape Coral almost always has a paper trail in the Lee County Official Records, and that trail decides what a closing looks like.
Notice of Commencement and Notices to Owner
Before the first inspection on most jobs over a modest dollar threshold, the owner signs and records a Notice of Commencement under Section 713.13, Florida Statutes. It names the owner, contractor, lender and surety, and it expires one year after recording unless a different date is stated. Subcontractors and suppliers who want lien rights generally serve a Notice to Owner early in their work. If you received those notices from a block company, a truss supplier or a plumbing sub, they are the parties most likely to file a claim of lien if your builder did not pay them.
Claims of lien and the clock on them
Under Florida’s Construction Lien Law (Chapter 713), a lienor generally must record its claim within 90 days of its final furnishing of labor or materials, and a recorded lien typically must be enforced by a lawsuit within one year unless that period is shortened. An owner can sometimes shorten it by recording a notice of contest. A lien that was never enforced in time may be released through the title process, but that judgment belongs to a Florida attorney or title company, not to us.
Lis pendens
If a lienor, a lender or the original builder has sued over the property, a notice of lis pendens may be recorded under Section 48.23. It warns the world that a lawsuit affects title. A lis pendens does not automatically prevent a sale, but a buyer and title insurer will want a plan: a payoff, a settlement with a recorded release and dismissal, or a court order. We buy Cape Coral properties with a lis pendens on record regularly, and we build the time needed to clear it into our closing schedule. If a construction loan is in default, see our pages on selling during foreclosure and, for lenders holding the note, working with banks and private lenders.
When the builder lost its license or filed bankruptcy
You can look up any Florida contractor’s license status and disciplinary history on the DBPR license search at myfloridalicense.com. If your builder’s license was suspended, revoked or surrendered, it cannot continue your permit. If the builder filed bankruptcy, your contract and any deposit may be tied up in that case. Florida’s Homeowners’ Construction Recovery Fund, administered through the Construction Industry Licensing Board, may compensate some homeowners harmed by certain contractor violations, subject to eligibility rules, deadlines and caps. A Florida construction attorney can tell you whether you qualify; selling the house to us does not by itself end that claim, but ask counsel how a sale affects it before you close.
How Libera Capital Group Values a Half-Built House in Cape Coral
We do not apply a flat percentage or a formula from a website. We estimate what the finished house should be worth, subtract what it will really cost and how long it will take to get there, and show you the result. Here is what goes into that calculation for a Cape property:
- After-completion value. What comparable finished new homes in the same part of the Cape sell for, adjusted for lot type: a Gulf-access lot, a freshwater canal lot and a dry lot behave very differently.
- Cost to complete. Materials and labor for every remaining phase, plus permit renewal or re-permitting fees, engineering letters, revised plans, surveys, the elevation certificate, utility connections or septic work, and the final punch list.
- Correction costs. Repairing anything that deteriorated while the site sat: rusted reinforcing, water-damaged sheathing, mold in an enclosed but unconditioned shell, stolen copper or equipment.
- Payoffs and liens. Code fines or recorded code liens, unpaid UEP installments, mowing or abatement charges, contractor and supplier liens, and any mortgage or construction-loan payoff.
- Carrying and risk. Builder’s risk insurance, taxes, interest and the uncertainty of what is behind the stucco or under the slab.
The result is a cash price we put in writing with these categories spelled out. You are free to compare it with a bid from a new builder or an agent’s estimate of an as-is listing price, and we encourage you to.
Finish It, Hire a New Builder, List It or Sell It: Cape Coral Options Compared
| Factor | Finish it yourself (owner-builder) | Hire a replacement GC | List it as-is with an agent | Sell to Libera Capital Group |
|---|---|---|---|---|
| Upfront cash needed | High: materials, subs, permit fees, engineering | High: new contract deposit plus correction work | Low, but you keep carrying the property while it is marketed | None from you; costs come out of our side |
| Permit status | You must revive or re-permit and accept owner-builder responsibility | New GC takes over, often only after its own inspection | Buyer must solve it; many lenders will not finance an unfinished home | We handle renewal, re-permitting or close-out after closing |
| Code cases and mowing | Yours to correct and pay | Yours until the work catches up | Yours until closing; buyers discount for them | Paid or negotiated through title at closing |
| Liens and lis pendens | You resolve them | You resolve them, and the new GC may insist first | Must be cleared for most buyers to close | Resolved through the title company as part of our closing |
| Timeline | Often many months, depending on stage and inspections | Months, plus the wait for an available builder | Unpredictable; the buyer pool for shells is small | Typically days to a few weeks, depending on title |
| Potential upside | Highest if everything goes right | Strong if the budget holds | Market-dependent | Lower gross than a finished sale, but certain and fast |
| Main risk | Cost overruns, failed inspections, personal liability | Second builder failure, change orders | No financeable buyer; price cuts while carrying costs grow | You give up the finished-home upside in exchange for certainty |
There is no universally right answer. If you have cash, time and a builder you trust, finishing may net more. If any of those three is missing, a sale often protects more of your equity than another year of carrying costs. Our general comparison of a cash offer versus listing with an agent walks through the trade-offs in more detail, and if an all-cash price does not fit, ask whether a structure from our creative financing options could work.
How Selling an Unfinished Cape Coral House to Us Works
- Send us the address and what you know. The permit number, your builder’s name, any notices or violation letters, and photos if you have them. If you know nothing beyond the address, that is fine; we can pull the permit history and recorded documents ourselves.
- We walk the site and review the records. We look at the structure, the permit and inspection history in the city portal, open code cases, the UEP and tax status, and the Lee County Official Records for liens and lis pendens.
- You get a written offer with the math. After-completion value, cost to complete, correction costs and payoffs, laid out so you can check them. Your attorney is welcome to review it.
- We close through a Lee County title company. Payoffs and releases are handled at the table. You choose the date; you do not have to finish, mow, clean up or close permits first. Learn more on our how it works page.
Related Situations We Handle in Cape Coral
- Shells that also have tax certificates sold against them: selling with back taxes or liens.
- Half-built homes inherited through an estate: inherited and probate property.
- Finished but empty homes collecting violations: vacant property.
- Completed houses with major defects or fire damage: major repairs and fire damage.
- Stalled duplexes and small multifamily builds: multifamily properties; single-family spec homes: single-family homes.
- Unfinished commercial shells along Pine Island Road, Del Prado or Santa Barbara: commercial property we buy.
Unfinished Construction Help in Nearby Areas
- Lehigh Acres half-built homes
- Fort Myers & North Fort Myers
- Punta Gorda
- Port Charlotte
- North Port
- Naples & Golden Gate Estates
- Lee County
- Southwest Florida
Key takeaways
- You can sell a half-built Cape Coral house without finishing it, reviving the permit or hiring a new builder.
- Cape permits run through the Building Division’s online portal; a project with no passed inspection for months may already be expired.
- Once construction starts, the lot leaves the city’s mowing program and the 12-inch grass limit becomes your responsibility.
- UEP assessments, impact fees, flood elevation and storm exposure all change the cost to finish.
- Code liens, construction liens and a lis pendens are normally resolved through the title company at closing.
- We show our valuation math in writing; compare it with any alternative you are considering.
Frequently Asked Questions about Selling an Unfinished Home in Cape Coral
Can I sell a half-built house in Cape Coral without finishing it?
Yes. Libera Capital Group buys Cape Coral homes at any construction stage, from a slab with stem walls to a house that is nearly complete but cannot pass final. You do not have to finish the work, hire a replacement builder or revive the permit first. We estimate the cost to complete, put the math in writing, and handle the remaining construction and permit work ourselves after closing.
How do I find out if my Cape Coral building permit has expired?
Look up your address or permit number on the City of Cape Coral’s online permitting portal, or call the Building Division. The record shows the contractor of record, each inspection and its result, and the permit’s current status. If months have passed without a passed inspection, the permit may be expired or close to it even if you never received a notice, so confirm with the city directly.
Will you buy a Cape Coral shell that sat open through Hurricane Ian or Milton?
Yes, storm-exposed shells are part of what we buy. Block walls, trusses and sheathing that sat unprotected through a hurricane usually need an engineer’s evaluation before anything is enclosed, and some materials may need replacing. We factor that evaluation and any corrective work into our offer, so you do not need to commission the engineering report yourself before selling.
Does the Cape Coral lot mowing program still cover my lot after construction starts?
No, according to the city’s program information, a lot is removed from the Lot Mowing Program once it is cleared and building begins. After that, keeping grass, weeds and underbrush at or below 12 inches is the owner’s job. Owners who live elsewhere often miss this change and receive a code compliance notice. If you sell to us, mowing and site upkeep become our responsibility after closing.
My Cape Coral builder’s license was suspended. Can the house still be finished?
Yes, but not by that builder. A contractor with a suspended, revoked or surrendered license cannot continue the permit, so a new licensed contractor or a qualifying owner-builder must take it over through the city’s change-of-contractor process. When we buy a home in that position, we bring our own licensed contractor and handle the takeover. You can check any license on myfloridalicense.com.
Can I sell my unfinished Cape house if a subcontractor filed a lien?
Yes. A recorded claim of lien under Florida’s Construction Lien Law is handled through the title company at closing, either paid from proceeds, negotiated down with a release, or addressed another way your attorney approves. Liens also have enforcement deadlines, so some may be close to expiring. We review every recorded lien during due diligence and build the resolution into the closing plan.
What if there is a lis pendens on my Cape Coral property?
A lis pendens does not stop us from buying. It is a recorded notice that a lawsuit, such as a lien foreclosure or a lender’s foreclosure, affects the property. To close, the title company usually needs a payoff, a settlement with a recorded release and dismissal, or a court order. We coordinate with the parties and allow enough time in the schedule to clear it.
Do unpaid UEP assessments have to be paid before I sell an unfinished home in the Cape?
Not before; usually at closing. Utility Extension Project assessments and any outstanding installments appear in title work, and they are typically paid from the sale proceeds or accounted for in the price by agreement. We also check whether capacity or impact fees you already paid can carry forward, because that affects what the house will cost to finish and what we can offer.
Do you buy unfinished homes in the northwest Cape that are on well and septic?
Yes. Many stalled homes in the northwest and northeast Cape were permitted for a private well and septic system, sometimes with the well drilled and the septic work incomplete. If city lines have since reached the area, the plans may need to change to a city connection. We evaluate the utility path for each address and include it in our cost-to-complete estimate.
Can I sell a Cape Coral lot that has approved plans or an issued permit but no construction yet?
Yes, a permit-ready lot with approved plans is something we buy here. Approved plans, paid fees and an issued permit can carry real value, depending on whether they can be transferred or renewed. A bare lot with no plans or permits is different; for those, our land division at SWFLLand.com is the right place to start.
How much will you pay for an unfinished house in Cape Coral?
It depends on the specific house, and we explain our number in writing. We start with the expected value of the finished home for that lot type and area, then subtract the cost to complete, corrections for anything that deteriorated, payoffs for liens and fines, and carrying costs. We do not use a flat percentage, and you are free to compare our offer with any other option.
How fast can you close on a half-built Cape Coral home?
Often within a few weeks, and sometimes faster when title is clear. The main variable is the title work: open code liens, construction liens, a lis pendens or an estate can each add time while releases and payoffs are arranged. If you need more time, for example to move belongings or settle an estate, we can set a later closing date that suits you.
Are you acting as my real estate agent when you buy my Cape Coral property?
No. Libera Capital Group buys as a principal, for its own account. Our principals hold Florida real estate broker licenses, but we do not represent you, the builder, the lender or any other party in the transaction. That is why we encourage you to have your own Florida attorney or advisor review our offer and closing documents before you sign.
Can family members who inherited an unfinished Cape Coral home sell it to you?
Yes, once someone has legal authority to sell. That is usually a personal representative appointed by the probate court, or heirs whose title has been established through the estate process. We can work alongside the estate’s attorney, keep the site secured and coordinate timing with the court, and the house does not need to be finished before the estate sells it.
Ready to Stop Carrying a Cape Coral Project That Isn’t Moving?
Send us the address and whatever paperwork you have. Libera Capital Group, a DiBe Company, will review the permit history and title, walk the site and give you a written cash offer that shows the math. Call (239) 686-0823 or email acquisitions@liberacg.com.
